Approved

500 Washington St., Boston, MA 02111
(Google map)

Notes:

  • Connect Fire Alarm to Large exhibits - Marc

  • Hall of light needs to be broken up

  • Researching: map, living gallery

LARGE

Insideout

  • Shine/Marie Installing Oct 9-19

  • All materials and tech is on site.

  • Spec furniture for around it.

Immersive Theater

  • Design has been finished. Currently purchasing and waiting on dates.

  • Floor? Bleachers, different seating?

Let’s Survive Forever

  • Structure installed

  • Scrim takes 2 weeks to make as of 9/18. Will be installed immediately after

LED light floor

  • Adrian Cake installing Oct 16th. (Earliest they could do, they’ve currently on a huge install)

NEW

Draw alive

  • In the process of purchasing. What do we add around it?

Sound cloud

  • In creation stage: Listening device - Steven.

Andy Arkley - Together

  • Quote received.

Iris

  • Purchase setup, spec out Tech.

MEDIUM/SMALL

Insta-nonsense (new magic mirrors)
Current status = tech figured out. Purchasing. Easy install. Looks like the 8x3 configuration is best, but depends on BK’s chosen location

We are all Artists
Current status = canvas and LED light purchased/being created.

Halo lights
Purchased - delivery in 2 weeks as of 9/2

Pepper’s Ghost (CRT Tvs)
Not sure if this is approved for Boston or Chicago. But it’s being put together in Chicago the last week of October.

Oracle (Zoltar)
Built - ready to have clothing put on and shipped.

LED Wall - New Zealand
Ready to be installed.

NEW

Hall of Lights (Smaller)
Contacted Justin Gitlen

WNDR Map
Shuvo working on.

Mini Scene
A miniature scene in the AV room door.

Poet
Create environment around the poet in the alcove.

Color & Light
Within the tiny old AV room next to Kusama. (store display CPU on wall mounted Rack up high)

Shhh!
Spec out and research.